1. Renovating the building structure, painting and maintenance of Design Building
(1)Time Period: July 6 to August 15, 2020.
(2)Area to be Renovated: Front and roof of Design Building.
2. During the renovation period, please stay away from the front side and the roof of Design Building; rather enter or exit via the entrance next to the elevator near the ladies’ room in the back of the building.
We apologize for any inconvenience this may cause. Your cooperation is highly appreciated.
Best regards,
Chengkung Administration and Energy Management Section
